logo
ยินดีต้อนรับ Pan Asia Diesel System Parts Co., Ltd.
+86 13143601772

Combustion Leakage Returned After a New Washer – Injector Seat Erosion Was the Missing Issue

2026-09-16
กรณี บริษัท ล่าสุดเกี่ยวกับ Combustion Leakage Returned After a New Washer – Injector Seat Erosion Was the Missing Issue
Case Detail

 

The Same Problem Came Back

A South African workshop repaired combustion leakage around a diesel injector by replacing the lower sealing washer.

For a short period, the area remained clean.

Later, black carbon began building around the injector again.

Instead of replacing another washer immediately, the technicians inspected the injector seat more closely.

The Washer Was Only One Part of the Seal

The lower injector seal depends on two surfaces working together:

the sealing washer and the injector seat.

If the seat has become eroded, uneven, or damaged, a new washer may not create a reliable sealing surface.

Combustion gas can then escape again.

Seat Condition Was Inspected

The injector was removed and the bore was cleaned.

The workshop found that the seating surface had deteriorated.

This explained why repeated washer replacement had not created a lasting repair.

Correcting the Root Cause

The seat was restored according to the workshop repair procedure.

The injector and appropriate sealing components were then installed again.

The engine was run and the injector area monitored.

No new combustion leakage appeared during verification.

South African Application Context

Diesel engines operating for long hours in commercial, agricultural, and industrial environments can accumulate significant deposits around injectors.

When leakage has existed for a long period, the workshop should consider whether the seat itself has been damaged rather than assuming the washer is the only issue.

Case Conclusion

This case shows why repeated injector sealing failure requires inspection of the cylinder-head seat.

Replacing the washer without correcting an eroded seating surface can allow the same fault to return.

The sealing interface must be treated as a complete system.